ARCH
465
Special Topics in Construction: Working Drawings
Spring 2002
Jonathan Ochshorn Department of Architecture, Cornell University, Ithaca, NY 14853
contact | back to homepage | ARCH 465 index

Assignment #8: Working Drawing Set - Detail Sheet

Issued: 26 March 2002
Due: 2 APril 2002

Produce a sheet of details for your final working drawing set. While this drawing may be revised before the final submission, make it as complete as possible at this time.

Anticipate final format, including title block (refer to mock-up prepared earlier). Use 11"x17" paper size if possible. Submit photocopy.

Tentative schedule for remainder of term:

  • Due 4/9/02: Sheet of sections
  • Due 4/16/02: Sheet of floor plans (possible with site plan?)
  • Due 4/23/02: Sheet of schedules, title sheet, etc.
  • Due 4/30/02: Review
  • FInal project due: Thursday, May 16, noon, 121 B Rand Hall

last updated: 26 March 2002

Copyright 2002 J. Ochshorn. All rights reserved. Republishing material on this web site, whether in print or on another web site, in whole or in part, is not permitted without advance permission of the author.