| ARCH 465 |
Special Topics in Construction: Working Drawings | ||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Spring 2002 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Jonathan Ochshorn | Department of Architecture, Cornell University, Ithaca, NY 14853 contact | back to homepage | ARCH 465 index |
||||||||||||||||||||||||||||||||||||||||||||||||||||||
Assignment #5: Detail research and drawing
Issued: 26 February 2002 Select one aspect of your design that requires research; document the research (Arch. Graphic Standards, Sweets Catalog, web sites, texts, other working drawings, etc.) and prepare drawings indicating solution to this aspect of your project (e.g., bathrooms, elevators, stairs, curtain wall, etc.)
Selected Standard Reference Symbols
last updated: 4 March 2002 Copyright 2002 J. Ochshorn. All rights reserved. Republishing material on this web site, whether in print or on another web site, in whole or in part, is not permitted without advance permission of the author. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||