| - |
Monday |
Wednesday |
Friday |
| 1 |
- |
- |
Aug 26 Course overview, systems |
| 2 |
Aug 29 Fire safety; sprinklers FAL reserve #8 ch.2 |
Aug 31 Assign#1 issued Construction types (part I) Text: pp.4-10 |
Sept 2 Construction types (part II) |
| 3 |
Sept 5 Assemblies FAL reserve #14 ch.7 or find it online; Text: p.804 |
Sept 7 Egress FAL reserve #4 "Egress" (also electronic course reserve) |
Sept 9 Stairs, Escalators, Elevators FAL Basic Construction References |
| 4 |
Sept 12 Assign#1 due Accessibility/sustainability
ADA/ABA tech. chapters
Text: pp.12-13; LEED pp.14-15; LEED online; critique#1; critique#2; Green Globes
|
Sept 14 Masterformat Text: pp.11-12
link to 2004 masterformat PDF |
Sept 16 Concrete: properties Text: ch.13 |
| 5 |
Sept 19 Concrete: construction Text: ch.14-15 |
Sept 21 Foundations Text: ch.2 |
Sept 23 Wood: properties Text: ch.3 |
| 6 |
Sept 26 Wood: construction Text: ch.4-5 |
Sept 28 Wood: construction Text: ch.4-5 |
Sept 30 Masonry I: properties Text: ch 8-9 | brick essay |
| 7 |
Oct 3 Masonry II: properties Text: ch 8-9 | stone essay |
Oct 5 Prelim I |
Oct 7 Final Project issued Masonry construction Text: ch.10 |
| 8 |
Oct 10 Fall break No class |
Oct 12 Steel: properties Text: pp.367-385 | SFSA video: "Steel Casting Advantages" |
Oct 13 Steel: construction Text: pp.386-457 | steel essay |
| 9 |
Oct 17 Assign#2 issued Enclosure: heat loss I Text: pp.604-606 |
Oct 19 Enclosure: heat loss II Text: p.203, 243-244 |
Oct 21 Barrier, cavity, rain-screen Text: pp.720-724 |
| 10 |
Oct 24 Movement, joints, sealants Text: pp.713-719 |
Oct 26 Sealant joint calculations Text: pp.724-728 |
Oct 28 Brick veneer [video] Text: pp.734-741 |
| 11 |
Oct 31 Assign#2 due Assign#3 issued Stone veneer Text: pp.741-745 |
Nov 2 Precast concrete Text: pp.746-752 |
Nov 4 Metal panels Text: pp.784-785 |
| 12 |
Nov 7 Glass Text: ch.17 |
Nov 9 Alum-glass curtain walls Text: ch 21 | curtainwall essay |
Nov 11 EIFS Text: pp.752-756 |
| 13 |
Nov 14 Assign#3 due Roofing: steep-slope Text: pp.200-205; 625-640 |
Nov 16 Roofing: low-slope [video] Text: ch.16 (567-591)pp.599-624 |
Nov 18 Subsurface waterproofing Text: pp.59-64 |
| 14 |
Nov 21 Plaster and gypsum board Text: pp.804-834 |
Nov 23 Floors & ceilings Text: pp.842-868 |
Nov 25 Thanksgiving break No class |
| 15 |
Nov 28 Prelim II |
Nov 30
|
Dec 2 Studio design reviews No class |
Final Exam Week |
- |
Dec 14 Final project due 7:00 pm, 121 Rand Hall (or hallway adjacent to office) |
- |