Jonathan Ochshorn
Room 121-B, Rand Hall
Department of Architecture
Cornell University
contact | homepage | current index for ARCH 262

ARCH 262: Building Technology, Materials & Methods
Course Outline, Fall 2000


week date topic reading assignments

Introduction 1 Aug. 28 Course overview/building systems ch. 1
Aug. 30 Wood: properties and details ch. 3

2 Sept. 4 Wood frame construction ch. 5-7 assign#1 issued
(wood frame)
Sept. 6 Roofing: steep-slope ch. 16 (592-606)

3 Sept. 11 Gypsum board ch. 23
Sept. 13 Foundations ch. 2

Construction
of structural
systems
4 Sept. 18 Bearing wall systems ch. 10
Sept. 20 Masonry: material properties;
construction details
ch. 8,9 assign#1 due

5 Sept. 25 Concrete: material properties;
construction details
ch.13
Sept. 27 Structural frame systems ch.11 (344-383)

6 Oct. 2 Steel: properties and details ch.11 (384-414)
ch.12
Oct. 4 Concrete frame; heavy timber ch. 4,14 final project
issued

Enclosure
systems
7 Oct. 9 FALL BREAK/NO CLASS
Oct. 11 Water, air infiltration,
insulation, condensation,
ventilation
ch.16 (572-576)

8 Oct. 16 Movement, joints, sealant joint
calculations
ch.19 (684-688) assign#2 issued
(sealant joint)
Oct. 18 Barrier, cavity, rain-screen walls ch.19 (674-683)

9 Oct. 23 Brick, stone veneer ch.20 (692-703)
optional brick essay
assign#2 due
Oct. 25 [Precast concrete, metal panels]
McDonough lecture, Warren 45
ch.15
ch.20 (704-710)
assign#3 issued
(cavity wall)

10 Oct. 30 Alum-glass curtain walls; glazing ch. 17,18,21
Nov. 1 [EIFS]
Meier lecture, 157 ES
ch.20 (710-714) assign#3 due

11 Nov. 6 Roofing: low-slope (video) ch.16 (566-571;
576-591)

Interior
systems
Nov. 8 Ceiling, wall,
floor systems
ch.22,24 assign#4 issued
(curtain wall)

Fire
protection
12 Nov. 13 Overview of fire
safety issues
see ref. #17
Nov. 15 Occupancy, construction types;
case study; handout
see ref. #7
(ch. 2)
assign#4 due

13 Nov. 20 Fire-rated assemblies see ref. #19 assign#5 issued
(code issues)
Nov. 22 Egress systems see ref.#5
see ref.#7 (ch.9)

Accessibility 14 Nov. 27 Ramps, doors, bathrooms see ref.#13 assign#5 due
Nov. 29 NO CLASS

Dec. 14 Final exam, 12:00 noon
Room "GS D"
final project due*

Dec. 8 Alternate Final exam, 12:00 noon
Room 101 WS (to be confirmed)

*bring final projects to RAND 121, or hallway in front of RAND 121, before final exam.
last updated: 14 December 2000

Copyright 2000 J. Ochshorn. All rights reserved. Republishing material on this web site, whether in print or on another web site, in whole or in part, is not permitted without advance permission of the author.